West Ring Road İnterchange Project
The Batı Çevreyolu Multi-Level Interchange Project, contributing to the development of Antalya’s transportation infrastructure, involves construction works aimed at creating safe and efficient road connections at different levels.The Portisan Goldpan Panel Formwork System and Portiwood H20 Timber Beam Formwork System were used in the project, contributing to the fast, safe, and efficient execution of reinforced concrete construction works.
Location:
Antalya / TÜRKİYE
Project:
Multi-Level Interchange Project
Project Scope:
Formwork applications for reinforced concrete bridge and viaduct piers, multi-level interchange structures, and connecting roads. Within the scope of the project, formwork systems were utilized for reinforced concrete structures with varying cross-sections and heights, ensuring safe, fast, and efficient construction processes.
Systems Used in the Project:
Share:
About the Project
The Batı Çevreyolu Multi-Level Interchange Project is one of the major transportation infrastructure projects undertaken to strengthen Antalya’s transportation network and improve connectivity between different routes.Within the scope of the project, Portisan formwork systems were used in the construction of reinforced concrete bridge and interchange structures. The Goldpan Panel Formwork System and Portiwood H20 Timber Beam Formwork System were preferred for reinforced concrete works with varying geometries, providing fast installation, safe working conditions, and efficient construction processes.
🛠️ Project Type:
Multi-Level Interchange Project
🧱 System Type: Panel Formwork System + Shoring Scaffolidng System
✅ Complexity:
The solution process required detailed planning and precise execution.